Last december I was invited to the 4th International Conference on Optimization Methods and Software 2017 that was held in La Havana, to present the study A Multistage Stochastic Programming Model for the Optimal Bid of Wind-BESS Virtual Power Plants to Electricity Markets. This study was developed in collaboration with Marlyn Cuadrado and Josep Anton Sánchez, from my same department in the UPC, and is a partial result of the research project FOWGEM. This study is a follow up of the previous work presented in the WindFarms 2017 Conference extended with a new methodology to treat the uncertainty, based in forecasting models, and the study of the quality of the stochastic solution through the Value of the Stochastic Solution. In the animated graph you can observe how the the probability distribution of several recourse variables (optimal bid, imbalances, charge/discharge and SOC) evolves along five working days.